TAKE THE LIFTING PLATFORMS EXAM, GOOD LUCK!
1. Question
Whose responsibility is it to train the Mobile Elevated Work Platforms Operator?
It is the worker
It is the employer
It is the Labour Inspectorate
2. Question
How many people can use the Platform?
The platform can be used by a maximum of two people, depending on the case.
The platform can be used by a maximum of one person, depending on the case.
The platform can be used by a maximum of three people, depending on the case.
3. Question
In the work area, is it important to maintain the cleanliness of the areas?
No, maintenance will be the responsibility of the cleaning services only.
Yes, it is necessary to maintain a good state of cleanliness of the areas.
4. Question
The charging cables must be made of:
Stainless steel
Galvanised steel without splices except at ends
5. Question
In the event of an accident at work...
We will look for a partner, to take him to the nearest hospital.
We will need to call an ambulance
The injured person must be transported immediately by any available machinery.
6. Question
The working platform must be fitted with the following safety devices:
A device (e.g. spirit level) to indicate whether the chassis inclination or slope is within the limits set by the manufacturer. For MEWPs with mechanically operated outriggers this device must be visible from each outrigger control position.
Type 3 MEWP must be fitted with an audible warning signal when the maximum tilt limits are reached.
All are correct
Device to prevent it from moving when not in transport position. (Pedestrian and self-propelled Type 1 MEWP)
7. Question
What does MEWP mean?
Both are correct
Mobile elevating platform for personnel
Mobile extendable personnel platform
8. Question
Who is responsible for Mobile Elevating Platforms maintenance:
The worker
The Employer and the Worker
The employer
9. Question
The platform shall be equipped with handrails or any other structure around its entire perimeter at a minimum height of:
Minimum height of 0.50 m
A minimum height of 1.50 m
A minimum height of 0.90 m
10. Question
The support bases of the stabilisers must be constructed in such a way that:
can be adapted to soils with a slope or gradient of at least 5°.
can be adapted to soils with a slope or gradient of at least 10°.
can be adapted to soils with a slope or gradient of at least 1°.
Abrir WhatsApp
1
WhatsApp
Hola. ¿Cómo puedo ayudarte?